| Kode Ruas Jalan | 233K11 |
|---|---|
| Nama Ruas Jalan | BUNDARAN SIMPANG LIMA PURWODADI |
| Panjang Ruas | 0.51 m |
| Lebar Jalan | 9.50 m |
| Hambatan Samping(HS) | Sedang |
| Lebar Bahu | 1 |
| Aligement | Datar |
| Tipe Jalan | 2/2TT |
| (C0) Kapasitas Dasar | 4000 |
| (FClj) Faktor Penyesuaian Lebar Jalan | 1.36 |
| (FCpa) Faktor Penyesuaian Pemisah Arah (untuk TT) | 1.00 |
| (FChs) Faktor Penyesuaian Hambatan Samping | 0.92 |
| (FCuk) Faktor Penyesuaian Ukuran Kota Sumber : |
1 ( Jumlah Penduduk 1.4 Juta Jiwa ) |
| Kapasitas Jalan (Co x FClj x FCpa x FChs x FCuk) |
4,986 SMP/Jam |
| Jenis Kendaraan | Total |
|---|---|
(1) Motor |
119935 |
(2) Mobil |
91881 |
(3) Mobil Besar |
3780 |
(4) Pick Up |
4979 |
(5a) Bus Kecil |
374 |
(5b) Bus Besar |
83 |
(6a) Truk Ringan |
137 |
(6b) Truk Sedang |
5997 |
(7a) Truk 3 Sumbu |
1172 |
(7b) Truk Gandeng |
11 |
(7c) Semi Trailer |
2 |
(8) Tak Bermotor |
294 |
| TOTAL | 228645 |
| LHR Tahunan (Selang Kepercayaan) | 783.13<=LHRT<=1119.95 SMP/Jam |
|---|---|
| Kelas Jalan (Pedoman Desain Geometrik Jalan Ditjen Bina Marga 1997) | III |
| Fungsi Jalan | JKP 2 |
| Tingkat Layanan Sumber : |
A |
| Jam Puncak | Jam Puncak : 12.00 WIB |
| Hari Puncak : Hari ke-4; | |
| Arus Puncak : 1520.6; VC Ratio : 0.31 | |
| Lihat Grafik 233K11 Per Golongan |
| Uraian | Total Volume Kendaraan Selama 168 Jam | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Arus Per Jam | 1,360.98 | ||||||||
| Golongan | Jml | EMP | Hasil | ||||||
| Mobil Penumpang (MP) (2)(3)(4) |
599.05 | 599.05 | |||||||
| SM (Sepeda Motor) (1) |
713.9 | 285.56 | |||||||
| KB (Kendaraan Berat) (5a) (5b) (6a) (6b) (7a)(7b)(7c) |
46.29 | 60.17 | |||||||
| 944.78 | |||||||||
| VC Ratio | 0.19 | ||||||||
| Tingkat Pelayanan Jalan Berdasarkan PKJI 2023 | |||||||||
| -Pada Ruas Keseluruhan : A. Kondisi arus lalu lintas bebas dengan kecepatan tinggi dan volume lalu lintas rendah | |||||||||
| Segmen | 0+100 | 0+200 | 0+300 | 0+400 | 0+500 | 0+510 |
|---|---|---|---|---|---|---|
| Lebar | 9.50 | 9.50 | 9.50 | 9.50 | 9.50 | 9.50 |
| IRI 2024 | ||||||
| L4 | ||||||
| L3 | ||||||
| L2 | 7.6 | 9.2 | 8.1 | 5.6 | 9.4 | 7.3 |
| L1 | 9.6 | 14 | 11.5 | 6 | 11.7 | 13.3 |
| R1 | ||||||
| R2 | ||||||
| R3 | ||||||
| R4 | ||||||
| CL | 8.6 | 11.6 | 9.8 | 5.8 | 10.55 | 10.3 |
| IRI 2025 | ||||||
| L4 | ||||||
| L3 | ||||||
| L2 | 6.7 | 4.5 | 7.8 | 5.5 | 8.6 | 9.8 |
| L1 | 7.2 | 8.5 | 7.1 | 4.5 | 6.4 | 6.3 |
| R1 | ||||||
| R2 | ||||||
| R3 | ||||||
| R4 | ||||||
| CL | 6.95 | 6.5 | 7.45 | 5 | 7.5 | 8.05 |
| Kondisi | S | S | S | S | S | RR |